Rank: Newbie Groups: Member
Joined: 4/2/2010 Posts: 2
|
Hi All,
Has anyone else found that the Maximum value for the Progress Bar can not be updated in design or run time? If so, do you know how to fix the issue?
Thanks, Steve
|
Rank: Administration Groups: Administration
Joined: 5/27/2007 Posts: 24,201
|
Hi,
We do not believe there is any issue with this property. Setting it is the same way as setting any other property and we have verified the property works fine.
Thanks!
|